Toggle navigation
About Us
Interior Stone
Exterior Stone
Design Gallery
Resources
Get in Touch
Countertop Ordering Process
Quote
Review layout and options with your salesperson.
Receive a quote via fax or email.
Order
Approve quote and preliminary installation and measurement options.
Select material
Payment
Schedule measure and install dates (2 weeks from measure date)
Measure
Sink, faucet, and cooktops must be on-site at time of measurement.
Cabinets must be set and in place at time of measurement.
Final measurements are taken by a Lang Stone Drafting Technician (plan for 1-2 hours on average for measuring).
All options are verified with the decision maker at the time of measure.
Slab Selection
Granite / Marble slabs are viewed and selected at 4099 E. 5th Avenue.
All other material selections are to be scheduled and coordinated by a Lang Stone representative.
Fabrication / Install
Countertops are installed Sink is mounted (if contracted).
Countertops are sealed.
Job site is cleaned up.
Maintenance
Counters can be cleaned with daily granite cleaner.
Sealing is suggested annually.
Stone care products can be purchased at Lang Stone.
We do not recommend household cleaning products, only daily cleaner or soap and water.